Description
DETAILS
Aluminum Bracket.
Replacement part for a USB200.
INSTALLATION
Banding Fixtures are installed over the teller counter on the front edge of a soffit header or valance.
Install Fixtures in pairs as the Graphics read in pairs. Install the first two fixtures in the center of the desired location, and then proceed adding more fixtures to the right and left in even amounts.
Check building codes for overhead clearance.
SIZE & SPECIFICATIONS
1 Piece aluminum hang strip – approx. 28” long.
NOTE:
(3 self-tapping screws 1-1/4″ long NOT included)
1 Print Graphic size: 11″ high x 28″ long. (Supplied by Marketing)